top of page
yonetim teknik ltd.

YÖNETİMTEKNİK

Coca-Cola Plant Ashgabat
Ashgabat / Turkmenistan

A renovation construction in Ashgabat city of Turkmenistan for the adaptation of a 11.000 m2 existing old factory building into a coca-cola bottling plant.

Facilities :

Administration Building: 1.000 m2

Main Building: 10.000 m2

Investment amount: 20.000.000 USD

Construction area: 11.000 m2

Building ground area: 10.000 m2

© 2021 by Yonetim Teknik Construction (Yonetim Teknik Aras.Ltd.)

  • Linkedin
bottom of page